ok so im going to be getting 2 400 watt hps housings built with the cord that plugs directly into the digital ballast,, and im going to have 2 150's on each side ,, now im not electrician so how do I wire these 6 light into a junction box so all I have going to the genny is 2 plugs? thanks in advance