Quick question from a newbie
Last year I decided to do a build after fishing once a year on a friends boat in PA. There are not too many (if any) people here in eastern Connecticut that are out there on the lakes and ponds that I intended to fish. Well needless to say I was called in off the water by police the second night I was on the water. The state trooper was dumbfounded when I explained to him what we were doing. He said that even though we were across the lake away from anyone, complaints about the noise and the fact that there was light being reflected into their houses were called in. After a few more minutes of conversation he let us get back to fishing and told the home owners we were perfectly legal in what we were doing.
So now to the question, I am converting from a 5- 300W halo and geny setup to 6-50W LED (HPS color) lights from Seelite and battery setup. I will be running the 6 lights to a four toggle switch panel (1 switch for 2 lights on the left and right, and 1 switch for each of the fronts). My question is what do I do from the switch panel to get 3 lights to each battery setup (2 6V golf cart batteries in series)? Do I need to get a terminal block for each or run the individual wires to the batteries?
thank for the advice.
Last year I decided to do a build after fishing once a year on a friends boat in PA. There are not too many (if any) people here in eastern Connecticut that are out there on the lakes and ponds that I intended to fish. Well needless to say I was called in off the water by police the second night I was on the water. The state trooper was dumbfounded when I explained to him what we were doing. He said that even though we were across the lake away from anyone, complaints about the noise and the fact that there was light being reflected into their houses were called in. After a few more minutes of conversation he let us get back to fishing and told the home owners we were perfectly legal in what we were doing.
So now to the question, I am converting from a 5- 300W halo and geny setup to 6-50W LED (HPS color) lights from Seelite and battery setup. I will be running the 6 lights to a four toggle switch panel (1 switch for 2 lights on the left and right, and 1 switch for each of the fronts). My question is what do I do from the switch panel to get 3 lights to each battery setup (2 6V golf cart batteries in series)? Do I need to get a terminal block for each or run the individual wires to the batteries?
thank for the advice.