Well I've been traveling a lot making it hard to start this boat I'm dreaming good about but I finally ordered my material. I'll drive down and pick it up at the end of the week. Already have the motor which I'm really excited about it's a evinrude 225 I picked up and converted to a jet. Boat will be getting a kicker one day but have to gain a few pecos before that can happen.

This is my first full boat build so I'll be asking a lot of questions and advice.bottom will be 3/16 and sides 2x2 tubing front to back and 1.5 by 1.5 to sit on top of that centered every foot

Rough sketch
 
Discussion starter · #7 ·
Well down in Louisiana picking up the material tomorrow morning. Wish I could afford a guide to shoot some new water but 800 is way to steep for me.

Boat is gonna be a slick bottom if it doesn't turn I'll add my own runners out of angle
 
Discussion starter · #12 ·
Just a few questions for now looks like I'm gonna have to cut my 2x2 every few inches to form the rake what should I use thinking a wood chop saw blade might be to much?how should I trace out the 6ft rake on the sides? How many upright braces should I have on the sides and some say tie floor to sides some don't
 
Discussion starter · #35 ·
Thank guys I've ben hitting it hard because i'll be working seven days a week for the next five weeks on an outage and i'm shooting for a finished boat in July

As for the side supports I was to nervous to not have any boat will get 5 per side

And duty cycle is probably something I should know more about but to be honest I just brush And weld and take random breaks to allow it to cool down
 
Discussion starter · #40 ·
Well got time this weekend to do a little work the 2x2 tubing took a lot longer than I thought it would. Saturday we flipped the boat and I tig welded the outside seams was able to get it flipped back over and shoot a few fish with my buddies. Sunday welded in drain plugs and did a water test no leaks. Gonna do all the knee bracking and back deck this coming weekend and hang motor. Picked up a tracker tandem trailer with brakes
 
Discussion starter · #45 ·
Well been a good weekend went shooting twice and got some done put in 1 1/2 x 1 1/2 from side to side every foot front to back got the front deck and 2 pieces of the floor cut just need to drill holes and put weld them down. The deck I need to finish framing for the hatch before I cut it out.
 